March 25, 1994



                        --------------------------
                        |  COLLABORATION ON THE  |
                        |     CMS EXPERIMENT     |
                        --------------------------


1.GROUP MEMBERSHIP 
  ----------------

  What is the membership of the group which is joining CMS? Those listed 
should have committed a substantial fraction of their research time
over the next decade.

     Institution:

     Physicists:                Name                       E-mail





     Technical Staff:           Name                       Position
     (Engineers, Techs)




2. RD Interests for FY95 and FY96
   ------------------------------

   Please consider which RD efforts your group is interested in. The group
should be prepared to participate in these efforts in FY95 and FY96. 

     RD efforts           orts          R         CERN RD #                        




3. Group Support Available for CMS Activities
   ------------------------------------------

   What resources are available to your group in collaborating in the RD
program for FY95 and FY96? What are available for general CMS
participation.

     Engineering:

     Technical Staff:

     Shops:

     Computing Resources:

     Travel to take test beam shifts:


4. Technical Report Interests and Long Term Potential Responsibilities
   -------------------------------------------------------------------

   The major areas open to US groups are indicated below. Clearly, this
list is not meant to be inclusive, but simply to identify areas of opportunity.
Subsystem organization will initially presumably be along these lines .


   Hadron Calorimetry:
   (including HAD transducer)
   

   Front End Electronics:
   (including EM transducers)



   Muon Detectors:



   Inner Tracking:



   Trigger/DAQ/Simulations:



   Forward Muon Steel and Forward System Integration:




5. Additional Support Needed in FY95 and FY96 for CMS Activities
   -------------------------------------------------------------

   These activities might include the RD program, the writing
of the Technical Design, or any other activities in which your
group might participate.  

             CMS Activity:              Required Support:  

  FY95


  FY96


6. Additional Comments
   -------------------