Date: Tue, 11 Mar 1997 14:58:30 -0500 (EST) From: skuja@umdhep.umd.edu Subject: Modified HCAL Maating agenda for CMS week Dear colleagues: I am including a modified agenda for HCAL meetings during CMS week including the technical meetings on Saturday and Sunday March 15 and 16. The GOAL of the CMS week meetings is to: (1) Understand the status of the TDR (2) and to encourage the exchange of information on the interfaces within HCAL structure as well as with other subsystem interfaces. We have decided to delay the TDR schedule by about a month, so now the HCAL TDR milestones are as follows March 17: HCAL TDR (Draft I) May 1: HCAL TDR (Draft II) May 19: HCAL week at CERN & CMS Internal review of HCAL June 2: HCAL TDR (Final draft) June23: HCAL TDR presented to CMS Collaboration and then to LHCC (after CMS approval) July 7: LHCC week at CERN - presentation of HCAL TDR to LHCC at beginning of week. Please, BRING A COPY of your TRANSPARENCIES (and new text) with you to the meetings. ******************************************************************************** Saturday, March 15 (morning) Design & Engineering 40-5-A01 9:30 - 9:35 Minutes of December Meeting (Skuja) 9:35 - 9:40 Goals (Skuja) 9:40 - 10:00 HCAL Design Summary (Skuja) 10:00 - 10:30 HF Design Summary (Akchurin) BREAK 10:45 - 11:15 HB Engineering Design: Summary of TDR Write-up & Status (Churin) 11:15 - 11:35 HB Tooling for Assembly & Installation Summary of TDR Write-up & Status (Murbach) 11:35 - 12:00 HE Engineering Design/Assembly/Installation: Summary of TDR Write-up & Status (Kryshkin/others) 12:00 - 12:20 ME Support Structure and HE interface (Feyzi) 12:20 - 12:40 HO Engineering/Assembly/Installation Summary of TDR Write-up & Status (Mondal/others) 12:40 - 13:10 HF Engineering/Assembly/Installation Summary of TDR Write-up & Status (Ferrando/others) LUNCH Saturday, March 15 (afternoon) Performance Summary 40-5-A01 14:30 - 15:00 Status of HB Test Beam Analysis (de Barbaro) 15:00 - 15:30 Status of HE Test Beam Analysis (Kryshkin) 15:30 - 16:00 Status of HF Test Beam Analysis (HF group) 16:00 - 16:15 Physics requirements (Womersley) 16:15 - 16:35 Tau-calibration/simulation (Kinuunen) BREAK 16:50 - 17:10 Status of HB/HE/HF simulation (Kunori/others) Prototypes and Preparation for 1998 Test Beam 17:10 - 17:30 HB prototype status (Churin/Skuja) Status of Test beam Stand 17:30 - 17:50 HE prototype status (Kryshkin) 17:50 - 18:10 HO prototype status (Mondal) ******************************************************************************** Sunday, March 16 (morning) Optical System 40-5-A01 9:30 - 10:10 Optical System overview (de Barbaro) 10:10 - 10:30 Optical connector Optical cables/Optical Decoder Boxes (Ruchti) 10:30 - 11:00 Scintillator Quality Control & Choices (Hagopian) BREAK 11:20 - 12:00 HB/HE Optical transducers (HPD's) (Elias) HB/HE Cable layout (Elias) 12:00 - 12:20 HE Optical system and Layout (Kryshkin) 12:30 - 13:00 HO Optical system and Layout (Mondal) LUNCH Sunday, March 16 (afternoon) Calibration, Electronics, Costs & Schedule 14:30 - 15:00 HB Source Calibration (Barnes) 15:00 - 15:30 HB Laser/LED calibration (Onel/Kryshkin/Hagopian) 15:30 - 15:50 HF Calibration (Akchurin/Onel) 15:50 - 16:30 HB/HE Electronics/amplifiers (Elias) BREAK 16:50 - 17:10 HF Electronics/amplifiers (Hazen/Sulak) 17:10 - 17:30 Remote electronics & DAQ (Elias) 17:30 - 17:50 Controls (Elias) 17:50 - 16:30 Schedule & Costs (Green) ******************************************************************************** Monday, March 17: HCAL (HB/HE/HF) Engineering/Integration (Herve/Skuja) (chaired by A. Skuja) 40-4-C01 9:00 - 10:00 HE/EE Interface issues (Kryshkin/Surkov/RAL engineers) 10:00 - 11:00 Integration/Assembly/Installation/etc. (Churin/herve'/others) 11:00 - 12:00 Water Cooling of decoder boxes (Ruchti) Cables/Patch panels/Services (Elias/Barbaro/others) Monday, March 17: ALL 14:00 OPENING SESSION (M. Della Negra) Main Auditorium Monday, March 17 HCAL (HB/HE/HF) 17:00 HCAL IB (Skuja) (Restricted) 40-4-C01 Proposal for HO prototype section (Mondal) Author list & publications (Skuja) Status of Publication (Kryshkin) Modification to HCAL Technical Board (Green) Costs and Schedule (Green) ******************************************************************************** Tuesday, March 18: HCAL/ECAL Interface meeting In conjunction with ECAL meeting from 9-10:30 (J.-L. Faure) BREAK ECAL/HCAL integration engineering 160-1-009 11:00 Summary of HB/EB interface design (Lebeau/Churin) 11:45 Feedback on HE/EE interface design (Surkov/Kryshkin/RAL engineering/ etc. ) ++++++++++++++++++++++++++++++++++++++++++ Tuesday, March 18 HF (afternoon) 40-R-C10 (chaired by A. Ferrando) ******************************************************************************** Wednesday, March 19 HB/HE/HO (Gasparini) 8:30 - 10:00 HCAL/MU interface 40-S-A01 HO-B proposals (Mondal) HO-E proposals (Skuja) 10:00 - 12:30 Joint Trigger/MU meeting to be confirmed by Fabrizio 40-S-A01 Wednesday, March 19 (Herve') 16:30 - 19:00 Engineering & Integration 40-R-A10