Date: Wed, 03 Dec 1997 17:02:21 +0100 From: cmslist@cmsdoc.cern.ch Subject: CMS Week - Revised HCAL Agenda To: cmslist@cmsdoc.cern.ch Reply-to: skuja@umdhep.umd.edu X-CMSLIST: 4087 - 971203-170219 - Nov 27 17:01 - Marie-Claude for SKUJA Andris ------------------------------------------------------------------------ Sent to groups: CAH ( 321 people with e-mail ) 97/12/03 - 17:02:19 - by Marie-Claude for SKUJA Andris - mac-225-77.cern.ch 137.138.86.248 - Mozilla/4.03 (Macintosh; I; 68K) ------------------------------------------------------------------------ Error reports.......... cmslist@cmsdoc.cern.ch Address modification... cmspeople@cmsdoc.cern.ch PLEASE SEND ONLY REPLIES RELATED TO THE SUBJECT OF THIS MESSAGE TO the submitter.......... skuja@umdhep.umd.edu which is set as the default reply address ------------------------------------------------------------------------ Saturday, December 6: HF Review 40-5-A01 (organized by Ferrando & Akchurin ) (chaired by Jim Freeman) 10:30 - 12:00 A HF Design matching Budget and Physics (A. Ferrando) 12:00 AOB Saturday, December 6: US CMS HCAL Discussion (Skuja) 40-5-A01 (Restricted to US participants (nominally)) (after HF review: 2PM) Preparing for the HB PPP1 RFP (Freeman) Basis for Technical Evaluation (Churin/Freeman) Copper Cost analysis (Freeman) Preparing for the next review (Jan 8 & 9 at FNAL) (Skuja/Freeman/Hanlon) Status of WBS & HCAL Project (Hanlon) Status of Cost & Contingency analysis HB: Absorber (Freeman) Tooling (Murbach) Installation (Skuja/Ball ?) Optics: Materials (de Barbaro) Manpower (de Barbaro/Freeman) Calibration (Hagopian) Readout Boxes (Ruchti) Photodetectors (Elias/Cushman ?) Electronics (Elias) Front-end electronics Trigger/DAQ electronics Power supplies Control System Prototypes (Freeman) ******************************************************************************** Sunday, December 7 (morning) 40-5-A01 10:00 - 10:10 Minutes & Announcements (Skuja) Hadron Barrel & Common Systems 10:10 - 10:40 HB Status. PP Prototype I -- status Plans for '98 (Freeman) 10:40 - 11:00 Optics/Test beam (Barbaro) 11:00 - 11:30 Calibration, etc (Johnson/Hagopian/others) 11:30 - 11:50 Electronics (Elias) 11:50 - 12:10 Photodetectors(Cushman/others) 12:10 - 12:30 Decoder boxes (Ruchti) 12:30 - 13:00 HO-B status (Mondal) LUNCH Sunday, December 7 (afternoon) 40-5-A01 14:00 - 15:00 HE Status. PP Sector prototype status 1997 Test beam results Plans for '98 (Kryshkin/others) 15:00 - 15:30 HF Status Summary (Akchurin) 15:30 - 16:00 Installation & Assembly plans for '98 (Ball) BREAK 16:30 - 17:00 Simulation (Kunori/others) 17:00 - 17:15 Schedule and Costs (Hanlon) ******************************************************************************** Monday, December 8: HCAL (HB/HE/HF) 40-5-A01 Engineering/Integration (Herve/Skuja) (chaired by A. Skuja) 9:00 - 9:30 HE/ME/EE Interface issues (Kryshkin/others) 9:30 - 10:00 HB engineering design status/Vacuum Tank rail (Churin) 10:30 - 10:45 Installation status (Murbach) 10:45 - 11:00 HB Services, cables/53 degree gap (Freeman/Ruchti/Elias) 11:00 - 11:30 HE engineering design status/EMU/HE interface (Kryshkin/others) 11:30 - 12:00 HE Services, cables/53 degree gap (Kryshkin) 12:00 - 12:30 HF design/services (Akchurin) Monday, December 8: ALL 14:00 OPENING SESSION (M. Della Negra) MAIN AUDITORIUM Monday, December 8 HCAL (HB/HE/HF) 15:30 HCAL IB (Skuja) (Restricted) 40-R-A10 Announcements: Skuja Prototype status HB: Freeman, HO-B: Mondal HE: Kryshkin/others HF: Akchurin Costs and Schedule (Hanlon as CMS HCAL Resource Manager) '98 Plans/Approvals Hungary: Vesztergombi India: Mondal Russia: Golutvin/Kryshkin Dubna/MS: Golutvin/others Turkey: Zeyrek US: Hanlon (US HCAL Resource Manager) Others: ? AOB ******************************************************************************** Tuesday, December 9 HF General Meeting (chaired by Ferrando) 10:30-18:00 40-R-A10 Tuesday, December 9 HB/HE Test Beam (H2) 40-2-A02 (chaired by V. Hagopian) Agenda for CMS Test beam meeting on Tuesday 9 December 1997 at 9:00 am 9:00 - 9:25am Test beam requirements for CMS (HCAL) J. Freeman 9:30 - 9:55am Test Beam Table G. Ginther 10:00-10:25am H2 Test Beam G. Bencze (?) 10:30-10:55am DAQ and other electronics needs F. Szoncso (?) 11:00-11:15am Safety issues, if any R. Schmidt (?) 11:15-11:35am Test beam needs for the Endcap V. Kryshkin (?) 11:35-12:00noon H2 Test Beam discussion ******************************************************************************** Wednesday, December 10 HB/HE/HO HCAL/Muon interface (Gasparini) 9:00 - 12:30 40-S-B01 Wednesday, December 10 HB/HE HCAL/ECAL interface & ECAL Endcap (Cockerill) 9:00 - 12:30 See agenda from D. Cockerill 40-R-A10 HE/EE interface issues (Kryshkin/others/RAL engineers) HB/EB interface issues (Churin/Lebeau/others) Wednesday, December 10 (Herve') 16:30 - 19:00 Engineering & Integration 40-R-B10