Date: Tue, 03 Mar 1998 17:48:12 -0500 (EST) From: skuja@umdhep.umd.edu Subject: Modified HCAL Agenda for March '98 CMS week Modified HCAL AGENDA: March CMS WEEK Dear Colleagues: The R/DMS group requested time for a meeting on Sunday afternoon. I have rearranged the Saturday/Sunday meetings to allow for such a meeting. The agenda for the Monday engineering meeting has also been reordered. If you wish to add a talk/delete a talk or advertise a session as part of the HCAL work week, please let me know and I will act on your request. Andris (*skuja@vxcern.cern.ch*) ******************************************************************************** Saturday, March 7: US CMS HCAL Discussion (Skuja) 40-5-A01 (Restricted to US participants (nominally)) (9:00 to 12:30) 10:00 Preparing for the Lehman Review (Skuja) 10:20 Status Summary of HCAL Microsoft Project (Reichanadter) Cost and Schedule; Descope and Contingency Analysis 11:00 HCAL Cost Analysis (Hanlon) 11:20 Absorber (Cost, Scope & Schedule) (Freeman) Tooling Installation 11:40 PPP (Cost, Scope & Schedule) (Freeman) Tooling Installation 12:00 Optics (Cost, Scope & Schedule) (deBarbaro): Materials Manpower ******************************************************************************** CMS HCAL Technical Meeting ******************************************************************************** Saturday, March 7 (afternoon) 40-5-A01 13:30 - 13:40 Minutes & Announcements (Skuja) Hadron Barrel & Common Systems 13:40 - 14:20 HB Absorber Status (Freeman) PP Prototype I -- status Plans for '98 '98 Assembly & Installation 14:20 - 15:00 Optics (deBarbaro) 15:00 - 15:30 Calibration, etc (Johnson/Hagopian/others) 15:30 - 16:20 Electronics (Elias) FE's Trigger/DAQ HV Controls BREAK 16:30 - 17:00 Photodetectors (Heering/others) 17:00 - 17:30 Readout boxes (Ruchti) PPP's for HB,HE & HO-B 17:30 - 18:00 HO-B status (Indian groups) OVERNIGHT BREAK Sunday, December 8 (morning) 40-5-A01 HE/HF/Luminometer/Physics 9:30 - 10:30 HE Status (Kryshkin/others) PP Sector prototype status Plans for '98 10:30 - 11:00 Luminometer plans (Snow) 11:00 - 11:20 Simulation Studies (Kunori/others) 11:20 - 11:40 New Physics Simulations (Womersley) 11:40 - 12:10 HF Status Summary (Akchurin/if available) 12:10 - 12:30 Comments (Dan Green) ******************************************************************************** Sunday, March 8: R/DMS Meeting (Golutvin) Room to be announced (14:00 to 18:00) ******************************************************************************** Sunday, March 8: US CMS HCAL Discussion (Skuja) 40-5-A01 (Restricted to US participants (nominally)) (14:00 to 18:00) 14:00 Readout Boxes (Cost, Scope & Schedule) (Ruchti) 14:40 Photodetectors (Cost, Scope & Schedule)(Heering) 15:20 Calibration (Cost, Scope & Schedule) (Freeman) Sources (Barnes) Laser (Hagopian) LED's (Akchurin) 16:10 Electronics (Cost, Scope & Schedule) (Elias) Front-end electronics Trigger/DAQ electronics Power supplies Control System 17:00 Forward Calorimeter (HF) (Cost, Scope & Schedule) (Akchurin) Luminometer (Snow) ******************************************************************************** Monday, March 9: HCAL (HB/HE/HF) 40-5-A01 Engineering/Integration (Herve/Skuja) (chaired by A. Skuja) 9:00 - 9:20 Integration report (Faber) 9:20 - 9:40 HB Services, cables/53 degree gap (Freeman/Ruchti/Elias) Patch Panel status 9:40 - 10:00 HE Services, cables/53 degree gap (Kryshkin) 10:00 - 10:20 HF design/services (Akchurin) 10:20 - 10:40 Discussion (Faber/Pintus/All) 10:40 - 11:00 HCAL Installation Schedule (Herve') 11:00 - 11:20 HB engineering status (Churin) 11:20 - 11:40 Installation tooling status (Murbach/others) 11:40 - 12:00 HO-B Installation (Indian groups/others) 12:00 - 12:30 HE engineering design status/EMU/HE interface (Kryshkin/others) Monday, March 9: ALL 14:00 OPENING SESSION MAIN AUDITORIUM (M. Della Negra/E. Radermacher) Monday, March 9 HCAL (HB/HE/HF) 16:30 HCAL IB (Skuja) (Restricted) 40-R-B10 (Note: Be prepared for a long meeting) Announcements: Skuja CERN HCAL MOU's & the RRB - Status (Green) HCAL Submission to RRB (Hanlon as CMS HCAL Resource Manager) 1995-1997 expenditures for HCAL construction 1999 draft budget institutional participation matrix funding agency money matrix Paper '98 Conferences Prototype status HB: Freeman, HO-B: Indian groups HE: Kryshkin/others HF: Akchurin AOB ******************************************************************************** Tuesday, March 10 HF General Meeting (chaired by Akchurin) 10:30-18:00 40-R-A10 ******************************************************************************** Tuesday, March 10 HB/HE Test Beam (H2) 40-2-A02 9:00-12:30 (chaired by V. Hagopian) 9:00 - 9:15 Overview of the H2 test beam for CMS V. Hagopian 9:20 - 9:40 The H2 Test Beam Area - update G. Bencze 9:45 -10:05 Test Beam Table G. Ginther ++++++++++++++++++ PROTOTYPES: Schedule, assembly, where, who, needs, no of channels, etc 10:10 - 10:20 Assembly Hall, Building 186 A. Ball 10:20 - 10:40 PPP1 Barrel assembly, who, J. Freeman Megatile Insertion P. de Barbaro 10:40 - 11:05 End Cap Prototype V. Kryshkin 11:10 - 11:25 HO-B Prototype N. Mondal +++++++++++++++++++ BEAM, ETC.: 11:25 - 11:35 Beam defining counters P. de Barbaro 11:35 - 11:50 DAQ and Software D. Lazic 11:50 - 12:10 Manpower J. Freeman 12:10 - 12:25 The Muon test with magnet A. Benvenuti 12:25 - 13:00 Discussion ******************************************************************************* Tuesday, March 10 HB/HE Calibaration 40-R-C10 14:00-17:30 (chaired by V. Hagopian & V.Kryshkin) 14:00 - 14:15 Calibration meeting goals (A. Skuja) 14:15 - 14:30 Overview (J. Freeman) 14:30 - 15:00 Laser System, common portion and HB (V. Hagopian) 15:00 - 15:30 Source System (V. Barnes) 15:30 - 16:00 HE (V. Kryshkin) BREAK 16:15 - 16:45 HO-B (N. Mondal) 16:45 - 17:15 Decoder Box (R. Ruchti) 17:15 - 17:30 LED's (Akchurin/others) 17:30 - 18:00 Descoping of calibration and monitoring discussion ******************************************************************************** Wednesday, March 11 HB/HE/HO HCAL/Muon interface (Gasparini) 9:00 - 12:30 40-S-B01 (agenda to be confirmed) Wednesday, March 11 HB/HE HCAL/ECAL interface & ECAL Endcap (Cockerill) 9:00 - 12:30 See agenda from D. Cockerill 40-2-A02 (To be confirmed) Wednesday, March 11 (Herve') 16:30 - 19:00 Engineering & Integration 40-R-B10