Date: Wed, 04 Sep 1996 12:52:51 -0500 (EST) From: skuja@umdhep.umd.edu Subject: MODIFIED agenda for US CMS HCAL meeting sept 5-7 Dear colleagues: I include a MODIFIED agenda for the September US CMS HCAL meeting. Due to teaching duties, Prisca and Nural can only arrive at FNAL on Friday. To accommodate them I have changed the order of the presentations considerably. PLEASE CHECK the AGENDA for your new time slot. All meetings in WH8SW conference room. Thursday, September 5 (morning/FNAL) 10:00am Status of HB/HF baseline (Freeman/Skuja) 10:15am Status of HB design (Churin) Integration/interface issues News from Bulgaria (if any) Goals of China visit 10:45am Report on status of work on HB in China (Weimin) 11:00am Status of assembly/installation/integration work (Murbach) 11:30am Status of HF support system (??) 11:40am Status of cables/services layout (Freeman) 12:00noon Status of modelling work at Mississippi (Reidy/others) 12:15pm The HB PP Wedge project in 1997 (Green/Freeman/Skuja) Discussion Manpower Thursday, September 5 (afternoon/FNAL) 2:30pm Summary of status of Radiation Damage work (Hagopian) 3:00pm Calibration Group report (Akchurin/Barnes/Onel) 3:30pm Status of Source design (Barnes) 4:00pm Optical design (Freeman/Budd/Skup) 4:30pm Optical connectors (Adams/Ruchti) Friday, September 6 (morning/FNAL) 9:00am HB/HF Test beam report (Freeman/others) 9:45am Source calibration performance (Laasanen) 10:00am Status of Photodetector work (Cushman/Arisaka/others) Status of HPD work Status of test beam Neutron flux and implications for Mixing Boxes Friday, September 6 (afternoon/FNAL) 1:00pm Simulaton and Calorimeter design(Weimin/Kunori/etc.) Calibration Status of missing E_t work E/pi simulation Magnetic field effects in GEANT 2:00pm Status of electronics (Elias\Arisaka) 2:30pm Status of slow controls (Shea) 3:00pm HV status report (Akchurin/Onel) HV 1997 test beam summary HV engineering HV simulation HV calibration 4:15pm Discussion of Test beam requirements for 1997 (Skuja) Saturday, September 7 (morning/FNAL/all US HCAL) 9:00am US HCAL Project Budget (Dan Green) CMS HCAL scope 10:00am 1997 HB/HF Project (Green/Freeman/Skuja/all) 10:30am Group comments/proposals (Skuja) 11:30am 1997 HV Project (Green/Akchurin/Onel/all) 12:00noon Group comments/proposals (Skuja) We will treat 1997 as the first year of construction (mainly prototypes or pre-prototypes). A proposed construction budget and schedule for 1997 will be presented. Please be prepared to comment on your proposed contributions and budget.