Date: Fri, 24 May 96 18:25:31 SET From: MARICA@cernvm.cern.ch Subject: June CMS Week - HCAL Preliminary agenda Dear Colleagues: I enclose a revised preliminary agenda for the June CMS week. We will hold an HB/HF technical meeting on the Sunday prior to the CMS week as usual. Thus we will have a meeting on Sunday, June 2. If you want to give/drop a presentation or make suggestions for additional/alternate presentations please let me know soon. The agenda is PRELIMINARY and subject to change. Note that there is an ECAL/HCAL interface on Tuesday morning and an HCAL/MUON interface meeting on Wednesday morning. The HCAL IB meeting has been moved to Wednesday morning at the request of Dan Green and Jim Hanlon. Andris Skuja CMS HCAL IB Chair %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% HCAL meeting, CMS Week, CERN, Geneva, Switzerland (June 2 through June 7) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Sunday, June 2: Central Calorimeter (HB/HF) (open) Room: 32-1-A24 (chaired by A. Skuja / organized by Freeman/Kryshkin) Overview: 9:30 Acceptance of minutes (Skuja) 9:35 The baseline HB/HF (Green) 9:45 HCAL Scope to meet CMS guidelines (Green) 9:55 HCAL HB/HF interface (Skuja) 10:00 Status of HB Project (Freeman) Status of H2 Test Beam preparation (Freeman) 10:30 Status of H2/H4 test beam data analysis (de Barbaro) 10:50 ICL H4 Test Beam analysis (Graham) 11:10 Status of HF Project (Kryshkin) Status of H4 Test Beam (Kryshkin) Mechanical 11:40 Report on trip to Bulgaria (Churin) 11:50 HCAL/ECAL & HCAL/Muon interface status (Freeman) Calibration 12:00 Report of HB/HF calibration group (Akchurin/Kryshkin/others) 12:30 Lunch Electronics/Photodetectors/Slow controls 14:00 Status of photodetectors (Cushman/???) 14:30 Status of slow controls work at FNAL (Shea) Scintillator 15:00 Proposal for HF scintillator specs (Kryshkin) 15:15 Study of Kharkov injection molded scintillator and tiles/fibers (Sorokin) Simulation 15:30 Radiation backgrounds (Uzunian/others) 15:45 Radiation backgrounds (Fyziak) Summary 16:15 Conlusions(Freeman/Kryshkin) 16:30 Status of HCAL project (Green) 17:00 AOB ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Monday, June 3: HCAL (HB/HF/HV) Room 160-1-009 Engineering/Integration (Herve'/Skuja) (chaired by A. Skuja) 9:00 - 11:00 Assembly/Installation/etc. 9:00 CERN status (A. Herve'/H. Gerwig/L. Veillet) 9:15 HB Mechanical Design status (Churin) Report on Bulgarian visit (Churin) 9:45 Status of HB/HF simulation studies (Genchev) 10:15 Status of Assembly/Installation,fixtures, etc. (Murbach) 10:30 HF Assembly and Installation (Surkov) 10:45 HV assembly/installation issues (Ferrando/Akchurin) 11:00 - 12:00 Cables/Patch panels/Services 11:00 Present status of Cables/Services (G. Faber/R. Pintus/J.Elias) 11:15 HCAL response - Discussion (All) 11:30 HV requirements (Ferrando/Akchurin) Electronics report (12:00 - 12:30) 12:00 Status of Fermi system (Lofstedt) 12:30 Status of Slow controls work in Bulgaria (Vankov) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Monday, June 3: OPENING SESSION (M. Della Negra) Room: 30-7-018 (LEP Audit.) 14:00 Introduction (M. Della Negra) 14:20 Technical Status (E. Radermacher) 14:40 Project Management (G. Bachy) 15:00 QA and Planning at RAL (P. Sharp) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Note: The HCAL IB has been moved to Wednesday morning at the request of Dan Green and Jim Hanlon. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Tuesday, June 4: HCAL/ECAL Interface meeting (open) Room: 4-3-006 (chaired by A. Skuja/J.L. Faure) (TH Audit.) 9:00 - 12:30: - Status of ECAL mechanical engineering design (Lebeau) - ECAL cooling (Baillon) - Status of ECAL electronics layout (Denes/others) - Simulation of ECAL/HCAL interface (N.N.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++= Tuesday, June 4 (15:30 ) HV (Ferrando) Status of HV (agenda by Ferrando still open) Room: 4-3-006 (TH Audit.) (Meeting continuing on Thursday, June 6 at 9:30 in room 32-2-B16) 15:30 - ...... : Software -------- Software issues (Yu. Gershtein) (10') Compensation: simulating jets (A.Ferrando) (10') Progress on test beam analysis (R.Wigmans) (15') Integration & 1996 Milestones ----------------------------- HV Mechanical design status (A. Nikitine) (10') General integration issues: beam pipe, transporter design, civil engineering, etc. (A. Herve) (20') Status of shielding studies (Yu. Fisyak) (10') Background issues (A. Uzunian/V.Gavrilov) (10') Proposed design of HV module (A. Nikitine) (10') Status report on QF radiation hardness study (A. Ulyanov) (10') QF radiation damage tests (V. Hagopian/A.Akchurin) (10') Plans for radiation damage studies in Hungary (G. Bencze) (10') Progress with PMs studies (D.Winn) <=== if D.W. at CERN (10') Status on preamp circuits studies (L.Sulak) <=== not confir. (10') Review of HV Milestones (N. Akchurin) (10') Status of HV draft budget (N. Akchurin) (10') General information ------------------- Report on the visit to Chelyabinsk (V. Gavrilov) (15') Report on Turkish HV activities (M. Zeyrek) (15') The e.m. prototype ------------------ Status report (N. Akchurin) (20') Test Beam in July ----------------- Discussion and agreement on test beam activities. Actions to be taken. A.O.B. NOTE: Speakers are kindly requested to prepare their presentations accordingly to the scheduled times. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Wednesday, June 5 (Gasparini) Room: 13-2-005 8:30 - 10:00 HCAL/MU interface ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Wednesday, June 5: HCAL IB (HB/HF/HV) 10:30 - 12:30 Room: 13-2-005 (closed - CMS membership only) (chaired by A. Skuja) 10:30 HCAL Scope (Skuja) Latest HCAL cost estimates (Hanlon) US cost book status (Hanlon) Russia/DMS cost book status (Golutvin/others) India cost book status (????) China cost book status (????) HV status (Ferrando/others) 11:30 Scintillator Baseline report (Freeman/Kryshkin) 12:00 Status of regional HCAL IB's 12:30 AOB ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Wednesday, June 5 (Herve') Room: 32-1-A24 16:30 - 19:00 Engineering & Integration ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Thursday, June 6 (Ferrando) Status of HV (cont.) agenda by Ferrando still open Room: 32-2-B16 - see under June 4th 9:30 - 12:30